Skip to Main Content
Follow Us

New Walk Temporary Closure 16th September

Tuesday 10th September 2019

As part of the future works planned for Blue Bridge on the River Foss there will be some survey works undertaken at the bridge on Monday 16 September 2019.

It is anticipated that the survey will involve the lifting of the bridge for brief periods during the day. The lifting of the bridge will mean that access along the River Ouse foot / cycle way at New Walk will be stopped during the periods that the bridge is lifted.

Survey works will be undertaken between 0930hr and 1500hr.